Arsenic Removal System Keeps Village in Compliance

March 8, 2021

At Work on Arsenic Removal

The town of Camp Verde, Ariz., historically has had an arsenic problem, which led to the development of a new well approximately seven miles from the town. Initial arsenic testing indicated that the new well had low arsenic content, but arsenic levels had increased since pumping began. This increase along with the U.S. Environmental Protection Agency?s lowering of the Maximum Contaminant Level (MCL) to 10 ppb has the water company concerned about meeting the new arsenic standards.Water Remediation Technology (WRT) contacted the managers of the water system and the Arizona Department of Environmental Quality and proposed to install a small arsenic removal system on one of the satellite water systems that was consuming 7,000 to 10,000 gallons a day (6 to 8 gpm on demand) with arsenic levels around 25 ppb. The goal for the project was to consistently produce water with less than 10 ppb arsenic. It also was important that the installation operate with a minimum of attention from Camp Verde personnel.The Camp Verde System was designed to handle 6 to 8 gallons per minute in four 16"-diameter by 10¢-tall pressure vessels. Each vessel contained 6.5 feet of 20 ¥ 40 mesh Z-33 arsenic removal media. This media depth was chosen to enable the monitoring of loading over a shorter period of time than would be the case in a full size system that would contain about 15 feet of media per tank in larger tanks. The vessels were plumbed and valved to allow any tank to be the number one tank and to allow any tank to be taken off line without shutting down the system.

The plant was placed in operation on December 22, 2001 and has operated continuously since that time. pH analysis conducted in the field by Camp Verde staff has shown no significant change in the pH between feed and discharge. Rechecks of the iron assay have shown only modest iron increase in the discharge over the feed. (Feed = 0.2 ppm, Discharge = 0.7 ppm.) Arsenic levels in the feed have been consistent at 24 to 27 ppb. (See Figure 1.) All columns are continuing to remove arsenic. As of February 24, 2002, more than 363,000 gallons have been treated during seven weeks with no media change and no discharges over the MCL of 10 ppb. The test continues to run smoothly.

Download: Here

Sponsored Recommendations

2024 Manufacturing Trends Unpacking AI, Workforce, and Cybersecurity

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...