Many towns in Northeastern Illinois that do not draw their drinking water from Lake Michigan rely on deep well water to serve their communities; however, naturally occurring radium is found in much of this well water, leaving many of these towns in direct violation of federal regulations. Under current U.S.Environmental Protection Agency (EPA) regulations, utilities must keep radium levels under 5 pico curies (pCi) per liter of water.

The EPA projects there is a cancer risk for one to three people per 10,000 exposed at above the maximum contaminant level of 5 pCi/L. High levels of radium over a long period of time could expose a person to osteosarcoma, bone cancers, leukemia and lung cancer.

This is the kind of information that led residents of Sycamore, Ill., to worry when they learned that the city’s wells—which draw water from deep sandstone aquifers at an average rate of 1,200 gal per minute (gpm)—were producing radium levels averaging 8.25 pCi/L.

Alternative Options

Mike Swedberg, superintendent of water for the city of Sycamore’s Public Works department, knew the city had to fix this problem, but the question remained of how to do it. One common option for a utility has been to flush the radium to its wastewater plant, which typically is not as heavily regulated for radium as drinking water plants. Filtering it into sludge to be used as fertilizer in farms is another option. Yet these methods do not really get rid of the radium, they essentially just move it around.

“We really didn’t want to just hand the problem over to our wastewater guys,” Swedberg said.

A Vast Improvement

Sycamore officials consulted with officials of Elburn and Oswego, Ill.—nearby towns that previously hired and recommended Water Remediation Technology (WRT), a water treatment company based in Wheat Ridge, Colo., that specializes in contaminant removal.

WRT offered Sycamore a 20-year contract for which it would provide its Z-88 Radium Removal Process technology. This technology allows water to pass in an upflow mode through a fluidized bed of media in treatment columns, where radium is removed by ion exchange. According to WRT, the process uses a special conditioned type of Zeolite that is effective in removing radium without altering the water’s quality. Radium accumulates on the media, and WRT will periodically remove it and permanently dispose of it in a licensed facility in Hanford, Wash., which contains and disposes of radioactive materials.

In general, “the frequency with which WRT will exchange the media is determined by several factors,” said Tom Kaiser, Midwest regional sales manager for WRT. “The amount of radium in the water and the volume of water that passes through the system are the key determining factors.”

Swedberg said the numbers for the first quarter of 2008 project that the first well is producing just 0.02 pCi/L of radium, and the second well is producing nondetectable amounts. When the buildup of radium on the media reaches close to 5 pCi/L, WRT comes to replace the media and trucks the radium to Washington state for disposal.

Overcoming Challenges

In order to install this technology, the city had to vote to construct two brand new well additions. Convincing eight council members to vote unanimously to complete this project was not easy, and Swedberg was proud to have done it.

Swedberg said the process has been lengthy, with the pilot study taking place in 2003 and the new technology going online in 2007. The estimated purchase of the systems and reconstruction of the two wells cost about $1.4 million. “It seemed really expensive at first, but it is actually middle of the road” when looking at all the options together, he said.

“The biggest challenge from our side was skepticism about this relatively new technology, and that’s why we did a pilot study first,” Swedberg said. “And the cost was also a hurdle, but lessened by the fact that we did not have to handle the radium buildup or hire new operators to run the system.”

WRT usually operates with long-term contracts such as 20 years because the company contends they downsize costs a bit for the utilities. “The advantage of locking into a long-term contract is that you know what the costs will be, and WRT guarantees the performance of the system during the 20-year contract,” Kaiser said.

Ultimately, WRT’s technology proved to be the best option for Sycamore because there is no chemical handling involved for city staff, there are no liquid waste streams or disposal issues and no additional plant operators are needed to run the systems. Swedberg said there has been a strong positive reaction from the community to the city’s willingness to take action and seek out a fitting solution.

Download: Here

About the Author

Clare Pierson

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.