IBM to Spend $10 Million to Build New Water System to Contaminated Area

Sept. 16, 2004

The IBM Corp. will pay $10 million to pipe in water to town residents whose water was contaminated by the dumping of a microchip-cleaning chemical decades ago, the Environmental Protection Agency said yesterday.

An IBM contractor, Jack Manne Inc., is accused of dumping tetrachloroethylene, known as PCE, in the late 1960s and early 1970s from a workshop in East Fishkill, 77 miles south of Albany. PCE degrades naturally into trichloroethylene, which pollutes the groundwater.

The pollution was discovered in 2000. Since then, 103 homes have been fitted with filters to cleanse water for drinking, bathing and cooking. IBM is paying to maintain those filters.

The new water system will take 2 1/2 years to construct.

A government health assessment said people who drank tainted water from the area for many years may face a greater risk of cancer.

IBM and the EPA are still negotiating whether residents or the company will pay for the operating and maintenance costs of the water system once it's completed, EPA spokesman David Kluesner said.

A household would pay $166.44 per person annually, based on EPA estimates.

Source: AP

Sponsored Recommendations

2024 Manufacturing Trends Unpacking AI, Workforce, and Cybersecurity

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...