CH2M Hill, VolkerStevin Joint Venture Awarded AMP6 Contract

July 22, 2014
The contract is a design & construct framework for the next capital investment period, from 2015 to 2020

United Utilities has appointed C2V+, a CH2M HILL and VolkerStevin joint venture, as one of four construction delivery partners (CDP) for Asset Management Programme 6 (AMP6).

The AMP6 contract is a design and construct framework for the next capital investment period, from 2015 to 2020, and covers the full spectrum of works for both water and wastewater across the northwest England geographic area for which United Utilities is responsible. The contract could be further extended to 2026.

The framework comprises multidisciplinary activities including design, project management, construction, testing, commissioning and maintenance of water and wastewater treatment works, pipelines, pumping stations, reservoirs and mechanical and electrical installations.

"Today's announcement is the result of a lengthy, robust and rigorous selection process and we're confident that these are the right partners to help deliver real improvements for our customers and the environment during AMP6 and beyond," said Steven Fraser, United Utilities managing director.

Both CH2M Hill and VolkerStevin have experience working with United Utilities. The two companies also work together in other sectors including flood defense, environmental and marine.

Source: CH2M Hill

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Chemical Plant Case Study

Aug. 14, 2024
Chemical Plant Gets a Fiberglass Conduit Upgrade

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.