Water Factory 21 To Stop Production

Feb. 3, 2004
Orange County Water District has officially stopped producing water from its world-renowned water purification plant

The Orange County Water District (OCWD) has officially stopped producing water from its world-renowned water purification plant, known as Water Factory 21.

Water Factory 21, named for its use of 21st century technology – mainly reverse osmosis – was the nation’s pioneer sewer water purification facility. The Water Factory was shut down in anticipation of construction of an improved, high-tech and larger water purification plant to come on line in 2007.

The Water Factory will be demolished later this year to make room for the new water purification plant.

Online since 1975, Water Factory 21 is a worldwide, water-industry landmark for its purification of sewer water that ultimately meets or is better than drinking water standards. For almost 30 years, Water Factory 21 has produced about 15 million gallons of purified water each day. Visitors, such as the Deputy Prime Minister of Thailand, the Head of the Environmental Protection Agency from Catalonia Spain, the Secretary of Agriculture for Israel, and many other officials from around the globe have come to Orange County and OCWD to learn more about water purification, groundwater management and how to prevent subsidence and seawater intrusion.

Water Factory 21 was included as part of major water management and water purification textbooks since the mid-1970s. Hundreds upon hundreds of water managers, engineers, scientists and students from around the world have visited Water Factory 21 each year for the past many years.

A Groundwater Replenishment (GWR) System, a new high-tech water purification system, will produce water similar in quality to bottled water. GWR System water will be used to service a larger, expanded seawater barrier and to help drought-proof Orange County’s groundwater basin by providing better water reliability and more local control over part of our water future.

Using some of the same processes as bottled water companies, food manufacturers, and pharmaceutical companies, the new GWR System purification process will include microfiltration, reverse osmosis and ultraviolet light with hydrogen peroxide, producing water of near-distilled water quality. The GWR System is a joint project between the Orange County Water District and the Orange County Sanitation District. The new GWR System will ultimately provide enough water – 72,000 acre-feet per year – to meet the annual needs of 140,000 families.

Source: OCWD

Sponsored Recommendations

2024 Manufacturing Trends Unpacking AI, Workforce, and Cybersecurity

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...