Project Compares Brackish Water Desalination Technologies – Part 2
One Year Performance Comparisons
Operating costs and characteristics of the nanofiltration
(NF), reverse osmosis (RO) and electrodialysis reversal (EDR) systems were
monitored over the first year of operation (February 1999 to January 2000). The
records kept during the first year of operation included all the labor costs,
chemical costs, power consumption and downtimes. Therefore, EDR, RO and NF can
be fairly compared using this data. The SCADA system permits the equipment
operators to record the use of chemicals, power and time of operation for each
membrane system separately. Maintenance costs were relatively low due to the
one-year warranty coverage. However, mechanical improvements recommended by the
operations staff were significant.
Water Quality
The average total dissolved solids (TDS) of the raw water
feed to the plant is 1,000 mg/L. The system is designed to produce water of 370
mg/L TDS and 150 mg/L of hardness. These levels match the water quality of the
state water imported from the Calleguas Municipal Water District (CMWD). Table
4 gives the average water analysis for the raw water and final blended product.
Table 5 shows the product and reject quality from the three membrane systems.
Plant Flow Rates
Representative plant flows are shown in Table 6.
Labor
The total manpower cost was $168,000, which includes two
operators for nine hours/day at a productive hourly rate of $32/hr. Labor was
fairly evenly split between the technologies, with 16 percent for EDR, 15
percent for RO, 16 percent for NF and 53 percent for treatment plant operations
including general and preventative maintenance, laboratory analyses and
reports. Labor related to the EDR system included bi-weekly wash-downs and
stack probing. CIPs were performed every 1,000 hours of runtime. Daily Silt
Density Indexes (SDIs) on the NF and RO systems, as well as CIPs every two to
three weeks due to particulate and biofouling, were the major labor
requirements for these systems.
Chemical Consumption
The daily cost for EDR chemicals was $30.87, which included
hydrochloric acid, antiscalant (Argo AS120) and sodium bisulfite. The daily
chemical cost for NF was $34.89. This included antiscalant (Argo AS120,
Permacare 191 and Argo AF200) and sodium bisulfite. Cleaning chemical costs
were $1,302 for EDR, $12,635 for NF and $841 for RO. The NF chemical costs are
highest because proprietary cleaners were used for CIPs related to particulate
and biofouling. The cost for NF antiscalant pretreatment also is about double
per gallon in comparison to RO.
Power Consumption
Power consumption was 1,275 kWh/day for EDR, 1,460 kWh/day
for NF and 1,690 kWh/day for RO. Power cost is $0.069/kWh. The VFD pumps on the
EDR system helped save on the power consumption. Considerable energy savings
can be realized if the NF and RO pressurizing pumps were converted to VFD
operation. The current RO and NF systems require an orifice plate and motorized
valve to control inlet pressure and flow. If VFDs were used on the NF and RO,
the power reduction is estimated to be 40 percent.
Downtime
The total downtime for the EDR was 236 hours for the year
for CIPs, stack probing, stack wash-downs and valve maintenance. The downtime
for RO was 600 hours and for NF was 530 hours. This included moving membrane
elements, CIPs and valve repair. Therefore, EDR had the largest production for
the year at 342 million gallons followed by NF with 239 and RO with 224.
The RO and NF systems had problems with biofouling and
particulates. Rotating the elements was effective and improved flows and
pressure losses. The biofoulants clogged the first foot of the first element of
the first stage. The systems are shutdown when a large differential is noted in
the element. The first membrane element then is rotated to the last position in
the second stage, and the last element in the second stage is rotated to the
first position in the first stage. This cleans the fouled membrane and allows
for continued operation. There was a manufacturing flaw in the NF membranes and
the lead elements became delaminated during the first year of operation. The
membranes were replaced through the warranty from the manufacturer.
The EDR currently has minor problems with biofouling and
particulates but it has not affected the production, and the cleaning
procedures reversed any trouble that was experienced. There was a design flaw
in the water flow spacers. While they performed adequately, the spacers were
replaced during 2000 with a new design.
Annual Operating Costs
Table 7 summarizes the costs per thousand gallons of water
produced ($/kgal). The inevitable question is which technology worked out the
best. Each system performed the job it was required to do—produce 1 mgd
of 370 mg/L TDS and 150 mg/L of hardness water—but each had its own
unique problems. The EDR has outperformed the spiral wound RO and NF systems in
terms of cost of water produced, due to less downtime for CIPs and maintenance,
less power consumption and better performance with particulate and biofouling
agents that are present in the raw water.
Future Studies
There are many issues for continued study. Proposed pump
control changes to the NF and RO systems may make them more cost effective. The
fixed speed pumps on the RO and NF could be replaced with VFD pumps. This would
present savings on power. The plant may experiment with different antiscalants,
inter-stage pressure controls and additional pretreatment such as cartridge
filters or particle dispersant chemicals. It will have to be determined if the
power savings will offset the gain in the new operational costs. The EDR system
performance also may improve with the proposed additional raw water
pretreatment.
The raw water that currently is supplied to the plant is
chlorinated. This soon will be supplied as chloraminated water and the plant
operation will become capable of adding ammonia to convert the chlorine to
chloramine. Filmtec has supplied documents stating that the NF and RO membranes
can operate with the presence of chloramines in the water. The chloramines
should provide help with the biofouling problem.
The NF may out-produce both the RO and EDR in the next year
since the membrane defect problem has been corrected. Future EDR maintenance
costs may increase, including reversal valve seal replacement and stack
tear-downs for cleaning and spacer or membrane replacements.
The new Surface Water Treatment Rule regulations on
microbial barriers and TTHM/HAA5 pass-through may require another step to the
EDR process if the UWCD groundwater feed to the facility does not meet the more
stringent regulations.