EPA Issues Interpretive Statement on Pesticides and Water and Seeks Comment on Proposed Rule

Jan. 28, 2005

EPA is issuing an interpretive statement and a proposed rule in response to recent court decisions highlighting the need for EPA clarification regarding Clean Water Act (CWA) permitting requirements for the application of pesticides to or over the nation's waters.

The statement and proposed rule reflect EPA's long-standing policy that a CWA permit is not required where application of a particular pesticide to or over water is consistent with requirements under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA). Any pesticide that is approved for use in the United States must undergo extensive study and review to help ensure that, when properly used, it does not pose unreasonable risk to human health and the environment.

Benjamin Grumbles, assistant administrator for water at EPA, noted, "Clarifying this issue is critical because confusion over permitting requirements could keep public health officials from preventing or responding to an infestation of mosquitoes or from controlling an invasive species." Through this action the agency is reinforcing the importance for local officials, resource managers, agricultural producers, and other pesticide users of applying pesticides in accordance with their label directions. Applications of pesticides in violation of the labels are subject to enforcement under all appropriate statutes including FIFRA and the CWA.

EPA first solicited public comment on this issue in a Federal Register Notice published on Aug. 13, 2003. The public may provide input on the current proposed rule during a 60-day comment period.

Source: U.S. Environmental Protection Agency

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Chemical Plant Case Study

Aug. 14, 2024
Chemical Plant Gets a Fiberglass Conduit Upgrade

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.