Waldo & Gainesville Regional Utilities Wastewater Interconnect Project

Dec. 2, 2014

Cost: $5.5 million
Location: Waldo, FL
Year: 2013-11-27
Size: 11.5-mile force main
Owner: City of Waldo, Gainesville Regional Utilities
Designers: Mittauer & Associates Inc.
Contractor: Worth Construction & Development Inc., Watson Construction

The city of Waldo, Fla., is a town of approximately 1,000 residents located in Alachua County in northeast Florida.

Waldo’s wastewater treatment plant discharged its treated wastewater into a wetland area that connects to the Santa Fe River. Because the river is a classified as an Outstanding Florida Water, the Florida Department of Environmental Protection issued a consent order requiring the plant to find a solution to control these discharges.

After negotiations between the cities of Waldo and Gainesville, as well as the Gainesville Regional Utility (GRU) and Alachua County, a solution was reached. 

Designer Mittauer & Associates, along with contractors Worth Construction and Watson Construction, worked to build a new pump station and 11.5 miles of 10- and 12-in. force main. 

By decommissioning the old wastewater treatment facility, water could be sent directly from Waldo’s wastewater collection system to the GRU plant, eliminating the need for Waldo’s treatment facility. 

The project was funded by the U.S. Department of Agriculture’s Rural Development loan program and was completed in August 2013.

“I feel this project is a benefit to the city of Waldo because the Waldo connection to Gainesville Regional Utilities meets the current regulatory requirements, and it reduces the risk from further regulations that small town systems cannot afford to implement,” said Kim Worley, city manager for the city of Waldo. “There is also additional capacity for future growth. The design allows the city of Waldo to buy more capacity on an as-needed basis instead of building a much larger plant that has capacity for future growth but is costly to operate.” 

Project Year: 2013-11-27Contractor: Worth Construction & Development Inc., Watson ConstructionDesigners: Mittauer & Associates Inc.Owner: City of Waldo, Gainesville Regional UtilitiesLocation: Waldo, FLCost: $5.5 millionSize: 11.5-mile force main

Sponsored Recommendations

2024 Manufacturing Trends Unpacking AI, Workforce, and Cybersecurity

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...