Leo J. Vander Lans Advanced Water Treatment Facility Expansion Project

Dec. 4, 2012

Cost: $33 million
Location: Long Beach, CA
Year: 2012-12-04
Size: 8 mgd
Owner: Water Replenishment District of Southern California
Designers: CH2M HILL; CDM Smith
Contractor: Flatiron West Inc.

The Leo J. Vander Lans Advanced Water Treatment Facility in Long Beach, Calif., is the first of its kind. 

The southern California facility receives the tertiary treated effluent from the Long Beach Water Reclamation Plant and uses advanced microfiltration (MF) and reverse osmosis (RO) to further treat it. No other plant in the world uses this third-stage process. 

The result is water that is near-distilled quality, which is used at the Alamitos Gap Barrier. This series of barrier wells along the coast protects groundwater supplies from seawater contamination.

The facility currently produces 3,000 acre-ft of water per year. The facility expansion will double that amount to 6,000 acre-ft and reduce the area’s dependence on imported water. 

Residuals and backwash from the MF and RO concentrate from the existing facility are discharged into the sewer system. With pre-expansion waste streams of approximately 0.7 mgd, the plant already was dangerously close to reaching the existing permitted sewer discharge limit of 0.76 mgd. The challenge for the designers was to formulate an expansion of the plant without increasing the waste flow.

The design phase began in March 2010, but the Water Replenishment District of Southern California (WRD) has been conducting research and performing tests since 2008 in preparation for the construction. The design phase was completed in May 2012 and construction is underway.

“This innovative and creative engineering approach is expected to significantly improve efficiency and reduce operations and maintenance costs,” said Albert Robles, president of the WRD board of directors. “Upon completion, the Leo J. Vander Lans Water Treatment Facility will have the highest recovery rate of any MF/RO/UV indirect potable reuse plant.”

Project Year: 2012-12-04Contractor: Flatiron West Inc.Designers: CH2M HILL; CDM SmithOwner: Water Replenishment District of Southern CaliforniaLocation: Long Beach, CACost: $33 millionSize: 8 mgd

Sponsored Recommendations

2024 Manufacturing Trends Unpacking AI, Workforce, and Cybersecurity

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...