Gowanda Flood Damage Water System Recovery Project

Aug. 18, 2011

Cost: $2.2 million
Location: Gowanda, N.Y.
Year: 2010-12-01
Size: 350 gpm
Owner: Village of Gowanda
Designers: Wendel Cos.
Contractor: VCC Inc.; Manno Construction

The flash-flooding that took place on Aug. 9, 2009, in the village of Gowanda, N.Y., caused the tributaries of Cattaraugus Creek, Point Peter Brook and Thatcher Brook to flood much of the village, damaging about 400 homes and putting the village water supply out of operation. A boil water notice was issued. The storm rendered the Point Peter Brook reservoir source inoperable as a water source and the raw water pump station inoperable due to flooding and debris deposition. “Much of the village was flooded, eroded; there were homes destroyed; there were roads washed out,” said Jeffrey Telecky, project manager with Wendel Cos. “Their water system was put of service. Their reservoir was filled with sediment. It was, frankly, a big mess.”A backup well supply that had not been in service for 15 years had to be put in service to provide water to the village system. The project goals were to take the necessary steps to provide safe drinking water to the residents, provide necessary fire flows, end the boil order, provide two high-quality and operating sources of water, and get the Point Peter Brook Reservoir supply source back fully operational and back in service.“Ultimately what they ended up doing was rehabbing the emergency well and providing that water to their water treatment plant and treating it so that eventually the boil order came off. There were a number of long-term things that needed to be done mostly related to rehabbing their primary water source, which included getting all of the debris out of the Point Peter Brooke reservoir, rehabbing the pump station that pumps the water from there to the water treatment plant and a bunch of ancillary rehabilitation related to that,” Telecky said. To date the village has completed removal of 14,000 cu yd of sediment debris from the reservoir, rehabilitated the pump station and the reservoir is back in operation as the primary potable source of water for the village. There is an ongoing project for additional work upstream of the reservoir, including additional debris removal, Allen Spring flood damage repair, construction of a reservoir forebay and other related work to ensure the entire watershed supply source will be a safe supply for years to come. Project Year: 2010-12-01Contractor: VCC Inc.; Manno ConstructionDesigners: Wendel Cos.Owner: Village of GowandaLocation: Gowanda, N.Y.Cost: $2.2 millionSize: 350 gpm

Sponsored Recommendations

2024 Manufacturing Trends Unpacking AI, Workforce, and Cybersecurity

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...