San Luis Rey Wetland Mitigation Bank Restoration Begins

March 9, 2015
The San Luis Rey Wetland Mitigation Bank is a 54-acre existing agricultural field that will be restored to native floodplain wetland habitat

Wildlands announced that restoration is underway at the recently approved San Luis Rey Wetland Mitigation Bank in Oceanside, San Diego County, Calif. A groundbreaking ceremony was attended by local, state and federal agencies involved with the project including the city of Oceanside, California Department of Fish and Wildlife, San Diego Regional Water Quality Control Board and the U.S. Army Corps of Engineers.

The San Luis Rey Wetland Mitigation Bank is a 54-acre existing agricultural field that will be restored to native floodplain wetland habitat. The bank is being established to offset unavoidable impacts to wetlands and riparian habitat in Northern San Diego County and Southwestern Riverside County. Public and private development projects with permits from the Army Corps of Engineers or California Department of Fish and Wildlife can mitigate their impacts by purchasing mitigation "credits" from the bank.

"This is a milestone project for Wildlands," said Steve Morgan, CEO of Wildlands. "The San Luis Rey bank represents a how a collaborative partnership between the resource agencies and Wildlands can result in an outstanding project."

Joining agencies in the groundbreaking were members of the Wildlands team and the Wildlife Heritage Foundation who will hold a permanent conservation easement over the bank and manage a non-wasting endowment to ensure for long-term management and protection of the habitat once established.

"I think most important is that we have to realize this land is going to be put away for habitat in perpetuity. It's going to be there for ever and ever," said Pat Shea, executive director of the Wildlife Heritage Foundation who participated in the groundbreaking.

David Castanon, chief of the Los Angeles District's Regulatory Div., said the groundbreaking is the result of a long effort. "I've been waiting 25 years for something like this," Castanon said. "We've always known we've preferred some sort of a landscaped watershed approach to mitigation instead of the small postage stamp effort that we have on permitting historically. We've been pursuing this, advocating for it for a long time."

"This in particular is very important because it's part of the recovery plan for the southern steelhead and other endangered species issues," said Therese Bradford, chief of the South Coast Regulatory office, "but the hydrology and fixing the hydrology is really our focus."

Wildlands plans to complete earthmoving and planting at the San Luis Rey bank by fall of 2015. Wildlands currently has several other established projects in Southern California for endangered species and wetland habitat mitigation and several others in the planning stages.

Source: Wildlands

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.