Every year, Industrial Water & Wastes Digest and its parent magazine Water & Wastes Digest accept nominations for Top Projects. The editorial team individually evaluates each project and provides scores for each of them. From these, we get a…
Location Asheville, N.C. Size 142,000 gpd Cost Not specified Facility Owner  New Belgium Brewery  Project Owner Evoqua Water Technologies Designer Evoqua Water Technologies Contractor  Evoqua Water Technologies  Manufacturer Evoqua Water Technologies…
Location Calistoga, Calif. Project Size 9,000 gpd Cost $182,000 for bioreactors and aeration equipment Facility Owner  Castello di Amorosa Project Owner REHS Designer BioMicrobics Inc.  REHS Contractor  PE REB Eng. Manufacturer BioMicrobics Inc.…
Location Yosemite Valley, Calif. Project Size 310 ft of head; 1,150 gpm Cost Not specified Facility Owner  San Francisco Public Utilities Commission  Project Owner San Francisco Public Utilities Commission Designer HERC Pro Solutions Contractor …
Location Clatskanie, Ore. Size 1,200 gpm Cost $120,000 Facility Owner  PGE  Project Owner PGE Designer NW Pump Contractor  NW Pump Manufacturer Ebara Equipment Sewage pumps  Northwest Pump provided the design, equipment, fabrication and…
Magnus Services aimed to be more cognizant of its water supply at all of its hydraulic fracturing sites, while reducing the necessary personnel required to control water use and to also better track water for delivery truck scheduling. Previous…