Foundry did not have an adequate storm water prevention plan

EPA Region 7 reached an administrative settlement with Acme Foundry Inc. of Coffeyville, Kan., to resolve industrial storm water violations under the Clean Water Act. Under the settlement, Acme Foundry must comply with its industrial storm water permit, pay a penalty of $28,975, and implement a Supplemental Environmental Project (SEP).

EPA investigations in March 2015 found that Acme Foundry, Inc., failed to comply with its industrial storm water permit due to unauthorized discharges containing pollutants. The company failed to:

  • Develop and update an adequate storm water pollution prevention plan;
  • Implement best management practices to reduce the amount of pollutants in storm water;
  • Perform facility inspections;
  • Conduct annual comprehensive site compliance evaluations;
  • Conduct visual storm water monitoring; and
  • Conduct employee training.

Under a previously issued administrative compliance order, Acme Foundry is addressing each of the violations and will install and maintain structural and non-structural controls to bring the facility into compliance with its industrial storm water permit.

Under this settlement, Acme Foundry will pay a $28,975 penalty for their alleged storm water permit violations and complete a SEP by Jan. 1, 2017, estimated at $600,000, to replace the existing wet scrubber air emissions control with a fabric filter, reducing air emissions.

Material handling and storage, equipment maintenance and cleaning, and other activities at industrial facilities are often exposed to the weather. Runoff from rainfall or snowmelt that comes in contact with these activities can transport pollutants directly to a nearby river or lake, or indirectly via a storm sewer and degrade water quality.

The Clean Water Act seeks to protect streams and wetlands that form the foundation of our nation’s water resources, which are critical in adapting to climate change impacts like drought, stronger storms, and warmer temperatures.

The settlement is subject to a 40-day public comment period before it becomes final. The public comment period began on May 19, 2016. Information on how to submit comments is available at www.epa.gov/ks/region-7-table-clean-water-act-public-notices.

Source: EPA

Sponsored Recommendations

2024 Manufacturing Trends Unpacking AI, Workforce, and Cybersecurity

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...