RJN Group Assists Water Main Improvement Project in Texas
RJN Group Inc. engineers are providing Garland, Texas, with design services, bidding assistance and construction assistance for the replacement of approximately 6,200 ln ft of existing 8-in. water main.
Workers are currently replacing the system with 8-in. PVC water main and approximately 800 ln ft of existing 6-in. and 8-in. fire hydrant leads and line segments. The project reaches to the first gate valve from the 30-in. water main.
The project is scheduled to come to a close at the end of this summer.
Source: RJN Group