NUCA President Testifies on Proposed Clean Water Restoration Act

July 24, 2009
Lyle Schellenberg suggested that infrastructure projects could be delayed by increased permitting requirements

National Utility Contractors Association (NUCA) President Lyle Schellenberg testified before the House Committee on Small Business July 22 at a hearing titled "Meeting the Needs of Small Businesses and Family Farmers in Regulating our Nation's Waters." The stated goal of the hearing was to "hear testimony from small businesses on ways to ensure that the federal regulation of waterways meets the needs of our environment and economy."

Schellenberg suggested that the proposed Clean Water Restoration Act (CWRA) (S. 787) is not likely to meet either of those needs.

He said (in part): "As currently written, the CWRA (S. 787) would remove the term 'navigable' from the Clean Water Act and allow the Army Corps or Engineers and Environmental Protection Agency to regulate all 'waters of the United States.' NUCA's fundamental concern with this legislation is that instead of providing greater clarity, it will lead to: bigger government, increased permitting requirements for wet areas with little or no impact on the nation's waters, higher compliance costs and inevitably, significant increases in litigation. At the same time, desperately needed water and wastewater infrastructure projects could be delayed by increased permitting requirements, even if they had no link to rivers, streams or other 'navigable’ water bodies.”

Citing the findings of the Clean Water Council's recent Sudden Impact study, Schellenberg also noted that such delays would hamper the realization of the economic benefits associated with utility construction and site improvement projects—namely, job creation, increased demand for goods and services, rise in personal income and the generation of state and local tax revenue.

"Recognizing the potential for recovery in the underground environmental infrastructure industry," he said, "Congress should be looking to expand market opportunities, not stifle them."

Source: NUCA

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Get Utility Project Solutions

June 13, 2024
Lightweight, durable fiberglass conduit provides engineering benefits, performance and drives savings for successful utility project outcomes.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.