Turkish Dam Project Raises Resettlement Concerns

Dec. 28, 2000

A hydroelectric dam planned in southeastern Turkey could force up to 78,000 people from their homes, according to a report by a World Bank resettlement expert.

Dr. Ayse Kudat reports that the Ilisu dam, which is being planned for the Tigris River 40 miles upstream of the Syrian and Iraqi border, could displace more people than the 25,000 originally estimated by the Turkish government.

The project was commissioned by a consortium of export credit agencies that are considering financing the project. The governments of Austria, Germany, Italy, Japan, Portugal, Sweden, Switzerland, the U.K. and the United States are all currently considering extending export credits or guarantees of about $850 million for the project.

Critics of the dam say it may cut off half the flow of the Tigris into Syria and Iraq, aggravating an already tense regional struggle over water.

Kudat's report says that the project's proposed resettlement plan would violate World Bank policy and Organization for Economic Cooperation and Development (OECD) guidelines.

The dam would submerge the 10,000-year-old city of Hasankeyf and at least 68 other towns and villages, displace many thousands of mostly Kurdish people, and destroy ancient cultural treasures.

Ilisu is at present the largest dam project in Turkey. More information is available at: http://www.hasankeyf.org/eng/links.htm.

(Source: Environment News Service)

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Meeting the Demands of Wastewater Treatment Plants

May 24, 2024
KAESER understands the important requirements wastewater treatment plant designers and operators consider when evaluating and selecting blowers and compressed air equipment. In...