Winchester Plant Expands Production Capabilities

Feb. 13, 2007

Hilliard, Ohio – February 12, 2007: Advanced Drainage Systems, Inc., (ADS), has announce that it has expanded its ARC chamber product line with additional production capabilities at its Winchester, Ky. facility. The full family of ARC and traditional BioDiffuser® leaching chambers will be manufactured in the Winchester facility by 2008.

To date the line has consisted of the ARC 36 – with the first mold introduced in January 2006, the ARC 36 HC in October 2006 and the second ARC 36 mold in November 2006. In January 2007, the ARC 24 was introduced and it is expected that a new addition, the ARC 18, will soon be added to the line.

Source: ADS

Sponsored Recommendations

2024 Manufacturing Trends Unpacking AI, Workforce, and Cybersecurity

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

State of Smart Manufacturing Report Series

April 25, 2024
The world of manufacturing is changing, and Generative AI is one of the many change agents. The 2024 State of Smart Manufacturing Report takes a deep dive into how Generative ...

ArmorBlock 5000: Boost Automation Efficiency

April 25, 2024
Discover the transformative benefits of leveraging a scalable On-Machine I/O to improve flexibility, enhance reliability and streamline operations.

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...