Xylem's Flygt brand is focused on performance. That is why we do more than manufacture pumps at our plant in Pewaukee, Wis.; we test them there, too. By investing in exclusive in-house testing capabilities, we can test some of the world’s largest pumps. As a result, we can verify the performance and energy efficiency of these pumps for a guarantee.

At the center of the test facility is a 440,000-gal (1,665-cu-meter) wet pit area designed for testing the largest pumps. Running alongside this is a dry pit test area, a bank of guide rails for submersible pump testing and an aboveground dry pit test area for conducting semi-closed loop tests on pumps up to 16 in. (40 mm). These facilities allow Flygt to test in accordance with the Hydraulic Institute and ISO standards, and/or any contract-specific requirements.

Click here to download a brochure detailing the facility's capabilities.

Sponsored Recommendations

Benefits of Working with Prefabricated Electrical Conduit

Aug. 14, 2024
Learn how prefabrication of electrical conduit can mitigate risk, increase safety and consistency, and save money.

Chemical Plant Case Study

Aug. 14, 2024
Chemical Plant Gets a Fiberglass Conduit Upgrade

Electrical Conduit Cost Savings: A Must-Have Guide for Engineers & Contractors

Aug. 14, 2024
To help identify cost savings that don’t cut corners on quality, Champion Fiberglass developed a free resource for engineers and contractors.

Energy Efficient System Design for WWTPs

May 24, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.