Water Reclamation Electrical Building

Oct. 7, 2019

Easi-Set Precast concrete buildings are proven functional and economical solutions for water and wastewater facilities. In particular, a growing market is evolving for their use for as pump and well houses, chemical/hazmat storage, treatment buildings, and control buildings. Larger needs are also met by joining precast modules and the use of Easi-Span (clear span) roof sections.

Interest in this type of building has evolved as companies like Easi-Set Buildings have brought attention to their functional value. Easi-Set buildings are fabricated using separate wall, roof and floor panels. Smaller buildings can be delivered completely assembled and outfitted straight from the manufacturing plant. Larger buildings are assembled on-site. Due to the modular technology, the buildings can be installed on a concrete slab/foundation or even a gravel pad in just a matter of hours, limiting work site disruption. They can also be customized and assembled around existing equipment or delivered pre-assembled without a floor to fit over it. In every case you end up with a cost-effective, low maintenance and long lasting solution, maximizing your return on investment.

Easi-Set Building Producer Smith-Midland delivered for ENR Top 400 Contractor Kiewit. This 40'x70'x14' all precast concrete Easi-Span Electrical Building with an antiqued Easi-Brick finish was manufactured and installed for their Franklin, TN water reclamation facility project. Manufactured indoors off-site, installation took just a week. This method proved very cost-competitive, high-quality, resilient, and required minimal site disruption.

Editor's Note: Scranton Gillette Communications and the SGC Water Group are not liable for the accuracy, efficacy and validity of the claims made in this piece. The views expressed in this content do not reflect the position of the editorial teams of Water & Wastes Digest, Water Quality Products and Storm Water Solutions.

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.