Aerzen USA Goes Off the Grid

March 1, 2013
Solar panel system generates entire facility’s electricity

Aerzen USA’s facility in Coatesville, Penn., is now running entirely on energy produced by a solar panel system created by RER Energy Group.

“This is unusual for a manufacturing facility,” said RER Energy Group President Jim Kurtz. “In most cases, solar only provides approximately half or less of a manufacturer's electric needs. But due to Aerzen USA’s emphasis on energy efficiency and the design of the LEED Gold building, the company is achieving this unusually high level.”

“It was never the main goal to save money, but rather to reduce our environmental footprint,” said Aerzen USA President Pierre Noack. “We want to reduce energy consumption as much as possible and then try to fulfill that need with solar energy.”

After trying for over two years to find the right solution for the solar project, the company decided in favor of a power purchase agreement (PPA) with RER. Aerzen submitted a number of Pennsylvania grants for this project, all of which either ran out of funds or were cancelled.

The RER Energy Group completed the installation, which consisted of 15 individuals working for about four weeks.

Source: Aerzen USA

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.
AERZEN_Claim_CMYK-300x70
Directory

Aerzen USA

Aug. 18, 2020