Report of the Arsenic Pilot Study Conducted at SCWA’s Madison Hill, Montauk, NY Plant.

Jan. 8, 2013
Hungerford & Terry, Inc. conducted a pilot study at SCWA’s Madison Hill plant, located on Madison Hill Road, Montauk, New York. The purpose of the study was to determine if the arsenic present in Wells 1, 2 and 3A could be reduced to non-detectable concentrations using the naturally occurring iron and a dual media, Greensand Plus and anthracite bed.