High-Strength Sewage Treatment Plant (MyFAST) Installation

Aug. 16, 2017
The MyFAST 60,000-gpd wastewater treatment system is installed under the parking lot of the Los Cabos International Convention Center. The water is reused for toilet flushing and to irrigate the 2700-cu-m green wall that covers the building's façade.
The MyFAST 60,000-gpd wastewater treatment system is installed under the parking lot of the Los Cabos International Convention Center. The water is reused for toilet flushing and to irrigate the 2700-cu-m green wall that covers the building's façade.

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.