A dome on a digester dating back to the 1960s was failing due to concrete spalling and corrosion of steel. Rather than fly a 90-ft-diameter dome with a crane, project managers elected for an install-in-place solution with interior coatings.
A dome on a digester dating back to the 1960s was failing due to concrete spalling and corrosion of steel. Rather than fly a 90-ft-diameter dome with a crane, project managers elected for an install-in-place solution with interior coatings.