EPA Announces Next Step for Chesapeake Bay Pollution Diet

July 5, 2010
Agency announces draft allocations for nitrogen and phosphorus as part of rigorous diet for meeting water quality standards

EPA announced draft allocations for nitrogen and phosphorus as part of a rigorous pollution diet for meeting water quality standards in the Chesapeake Bay and its tidal tributaries, and restoring local rivers and streams throughout the 64,000-sq-mile watershed.

“Restoring the Chesapeake Bay and its tributaries will not be easy,” said EPA Regional Administrator Shawn M. Garvin. “While we all recognize that every jurisdiction within the watershed will have to make very difficult choices to reduce pollution, we also recognize that we must collectively accelerate our efforts if we are going to restore this national treasure as part of our legacy for future generations.”

EPA proposed watershed-wide limits of 187.4 million lb of nitrogen and 12.5 million lb of phosphorus annually, and divided those allocations among the six watershed states and the District of Columbia, as well as the major river basins. These loadings were determined using peer-reviewed science and through collaboration with the states and the District of Columbia. EPA will assign draft allocations for sediment Aug. 15.

In addition, EPA is aiming to reduce air deposition of nitrogen to the tidal waters of the Chesapeake Bay to 15.7 million lb per year. The reductions will be achieved through implementation of federal air regulations over the coming years.

The jurisdictions are expected to use the allocations as the basis for completing Watershed Implementation Plans, detailing how they will further divide these allocations among pollution sources, and achieve the required reductions. The first drafts of those plans are due to EPA by Sept. 1. The jurisdictions are expected to have all practices in place to meet the established limits by 2025, with 60% of the effort completed by 2017.

EPA plans to issue a draft Total Maximum Daily Load (TMDL) or pollution diet for a 45-day public comment period on Sept. 24. The final Phase 1 Watershed Implementation Plans are due Nov. 29, and EPA will establish the Bay TMDL by Dec. 31.

In 2017, the jurisdictions are expected to submit updated implementation plans to ensure that all the control measures needed to meet Bay water quality standards will be in place by 2025.

Source: U.S. EPA

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.