RJN Group Awarded Texas Water, Wastewater Improvement Projects

Nov. 13, 2014
RJN will be a part of each phase of the project including a potential alignment study as well as the preliminary design, intermediate design, final design & construction.

Due to deteriorating water and wastewater lines, the city of Irving, Texas has awarded an engineering services contract to the consulting civil engineering firm RJN Group Inc., to design the Sam Hill, Millswood, Hidalgo, La Vida and Las Colinas Country Club Water and Wastewater Improvements Project.

RJN will design an estimated 25,910 linear ft of replacement and/or rehabilitation for water mains ranging in size from 6- to 8-in. diameter pipe and 22,220 linear ft of wastewater mains ranging in size from 6- to 10-in. diameter pipe.

RJN will be a part of each phase of the project including an alignment study (if needed), the preliminary design, intermediate design, final design and construction.

Source: RJN Group

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.