Inconvenient Fracks

Aug. 9, 2018
Fracking operation uses pumps and monitoring technology to facilitate a number of projects

Fracking typically uses between 1.2 and 3.5 million gal of water per well—large projects use up to 5 million gal. Sourcing these large amounts of water is a problem for the industry. Some companies truck water for use at a large expense; others use local close water sources—ponds, reservoirs, etc. Water transfer companies have used lay-flat hose or ring-lock pipe to transfer the water for short distances. Moving water more than a few miles has been an issue for the industry due to the cost and logistics of moving the equipment after a few fracking jobs.

One customer has 74 fracking jobs in a concentrated area but does not have a close water source to provide the necessary amount of water to support the activities. The timeline for the completion of all 74 fracking jobs is 24 months.

Solution

The customer decided to build a fracking pond in a central location to support its fracking activities. It chose Godwin pumps to move the water from existing sources multiple miles away to the temporary frack pond through HDPE pipe. Godwin selected Godwin Dri- Prime HL250M pumps and 18-in. HDPE pipe for this application. The water supply came from two freshwater ponds approximately one mile apart. One HL250M pump was used at each pond.

The pumps are outfitted with Godwin Field Smart Technology (FST) remote monitoring and control, as well as pressure transducers. The HDPE pipe runs from each pump into a single line and runs more than five miles into a manifold. This directs water into a 40,000-barrel storage tank or into the main frack pond another 1.5 miles away.

Result

The customer is very happy with the success of the project. It can review the pumping data on a phone or through Internet connection and can remotely start and stop the pumps using this technology. The two pumps are only 1.5 miles apart, but due to their remote location, it takes approximately 30 minutes to drive between them. The customer said Godwin’s remote monitoring and control is a great tool that saves it a lot of time and money. The rental period for this project is 24 months, yielding a multimillion-dollar success for Xylem.

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.