Orange Water & Sewer Authority Plant Receives Performance Award

Sept. 1, 2016
Partnership for Safe Water awards Phase IV Five-Year Excellence in Water Treatment Award

The Orange Water and Sewer Authority’s (OWASA) Jones Ferry Water Treatment Plant recently received the prestigious Phase IV Five-Year Excellence in Water Treatment award from the Partnership for Safe Water. OWASA is one of only nine utilities to date to achieve this longevity award that honors superior water treatment plant optimization and performance.  

Phase IV represents the highest possible level of performance that can be achieved in the four-phase Partnership for Safe Water program and signifies fully optimized plant performance that produces water quality surpassing required federal standards.

OWASA has participated in the Partnership for Safe Water program since 2002, and the Jones Ferry Water Treatment Plant received the program’s Phase IV Excellence in Water Treatment award in 2011. The plant has been recognized for its outstanding performance with partnership awards several times over the past five years, most recently receiving the program’s 10-Year Directors award in June 2015.

"Receiving the Five-Year Excellence in Water Treatment award highlights our ongoing commitment to water quality by the entire utility staff,” said Kenneth Loflin, water treatment and supply manager. “It’s a very significant achievement, and a key aspect of our ongoing efforts to optimize operations. Ensuring public health protection by improving the quality of the water delivered to our customers remains a steadfast goal that we continuously strive to meet and exceed."

The Partnership for Safe Water is a self-assessment program for water treatment plant and distribution system optimization. More than 250 utility subscribers collectively serving more than 100 million people commit to the partnership’s goals of providing safe, high-quality drinking water by achieving operational excellence in water treatment or distribution. Partnership utility subscribers participate in a rigorous four-phase self-assessment and peer review process, developed by water optimization experts, and achieve recognition for their commitment to the delivery of safe water for their communities.

Source: Partnership for Safe Water

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.