RJN Group Inc. is conducting a sanitary sewer evaluation study (SSES) to assist McClelland Consulting Eng. with the design of a new wastewater pump station for the city of West Fork, Ark.
The city has experienced wet-weather related overflows into the West Fork of the White River as a result of an aging wastewater treatment plant. The White River watershed serves as the drinking water source for a large portion of Northwest Arkansas.
For the SSES, RJN is performing the following services:
- · Flow monitoring for 60 days;
- · Smoke testing 75,000 linear ft of pipe;
- · Inspecting 300 manholes;
- · Dyed water flooding; and
- · Closed circuit TV inspection.
The data collected from the field inspections will be compiled into a report that McClelland can use in aiding the city of West Fork in reducing inflow/infiltration and also to provide the necessary data to properly size the proposed wastewater pump station for both average day conditions and wet-weather conditions.
This project is scheduled for completion in December 2014.
Source: RJN Group