Unregulated Contaminant Monitoring Regulation for Public Water Systems

Sept. 5, 2001
Amendment to the List 2 Rule and Partial Delay of Reporting of Monitoring Results

The Safe Drinking Water Act (SDWA), as amended in 1996, requires the U.S. Environmental Protection Agency to establish criteria for a program to monitor unregulated contaminants and to publish a list of contaminants to be monitored. In fulfillment of this requirement, EPA published Revisions to the Unregulated Contaminant Monitoring Regulation (UCMR) for public water systems on September 17, 1999 (64 FR 50556), March 2, 2000 (65 FR 11372) and January 11, 2001 (66 FR 2273), which included lists of contaminants for which monitoring was required or would be required in the future.

EPA is taking direct final action to correct an omission in the January 11, 2001, List 2 UCMR concerning laboratory certification. This correction will automatically approve laboratories of public water systems, that are certified to conduct compliance monitoring using Method 515.3, to also use Method 515.4 for UCMR analyses. Additionally, EPA is delaying requirements for the electronic reporting of unregulated contaminant monitoring results until its electronic reporting system is ready to accept data.

The January 11, 2001, List 2 UCMR requires certain public water systems to start reporting the results of their unregulated contaminant monitoring to EPA electronically by July 1, 2001. This rule notifies such public water systems that the electronic reporting system that EPA is developing to accept monitoring data is not ready and that EPA is removing the reporting requirement until it is available. This action does not delay or suspend the implementation of any of the requirements of the Unregulated Contaminant Monitoring Regulations for sample collection and analysis on the previously established schedule.

This rule is effective on November 5, 2001, without further notice, unless EPA receives adverse comment by October 4, 2001. If we receive such comment, we will publish a timely withdrawal in the Federal Register informing the public that this rule will not take effect. For judicial review purposes, this final rule is promulgated as of 1 p.m. ET on September 18, 2001 as provided in 40 CFR 23.7.

Source: U.S. Environmental Protection Agency

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.