Smith Flow Control Moves to New Facility

July 17, 2008
Larger manufacturing and assembly areas accommodate company’s growth

To accommodate for its continued growth, valve drive system and safety interlock manufacturer Smith Flow Control (SFC) has moved to a new location in Erlanger, Ky.

Besides providing a larger 2000-sq-ft office space for the growing company, the new 5100-sq-ft facilities also provide a more spacious 3100-sq-ft area for manufacturing and assembly of the Flexi-Drive remote valve operating system. In addition to the Flexi-Drive, all other SFC products will be available for sale from the new location to customers in the U.S. and Canada.

“This move was necessary to make room for our expanding business and stateside assembly of various SFC products,” said Kim Swinford, SFC regional business manager. “The new manufacturing area will allow more space for us to streamline our operations and improve on our already top-of-the-industry lead times.”

Source: Smith Flow Control

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.