RJN Group Awarded SSES Contract in Arkansas Town

Sept. 24, 2012
RJN will locate defects in the sewer system & eliminate overflows over a three-year period

RJN Group Inc. has begun work on a Sewer System Evaluation Survey (SSES) project for the city of North Little Rock, Ark. The SSES is part of the city’s strategy to meet the requirements of a Consent Administrative Order that was entered into with the Arkansas Department of Environmental Quality.

The SSES will take place over a three-year period with RJN locating defects in the sewer collection system to reduce inflow/infiltration and eliminate Sanitary Sewer Overflows. RJN’s responsibilities during the SSES consist of field services (such as flow monitoring, smoke testing, dye water flooding, and television inspection), data analysis, reporting and assistance to the city. By utilizing RJN Online, the city will have the ability to access field data as it is being collected (i.e. inventory data, condition ratings, photographs, etc.), allowing RJN and the city to discuss and review findings and identify issues and concerns. Phase 1 of the SSES will cover the White Oak Sub-Basin Drainage Area, which includes 410,000 linear feet and 2,350 manholes of sanitary sewer.

Source: RJN Group

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.