RJN Group to Evaluate Texas Sewer System

June 21, 2011
Company officials will perform manhole inspections for lines in Richland Hills, Texas

In an effort to reduce inflow and infiltration in sewer systems, officials in Richland Hills, Texas, have selected RJN Group Inc. (RJN) to perform manhole inspections and smoke testing of sewer lines in the southwest sewer shed of the city.

Earlier this year, RJN began conducting manhole inspections on 232 manholes and smoke testing of 108,800 ln ft of sewer lines. While inspecting the manholes, RJN field staff was looking for signs of cracking, collapse, root intrusion, deposition, grease, offset joints, active infiltration or other defects. Smoke testing will identify defects as well as illegal connections that may be contributing to the extraneous flows.

The results of the inspections and smoke testing, including the location of suggested repairs on the sewer lines, service lines and manholes, will be provided to the city by RJN through written and digital documentation. The city anticipates beginning construction to repair or replace the faulty sewer lines towards the end of 2011.

Source: RJN Group Inc.

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.