In 1998, the Holyoke Water Works completed a $21.3 million water system improvement program that brought this Massachusetts city into compliance with federal drinking water requirements. The new treatment plant, with a capacity of 14.8 million gallons per day, used chlorine for disinfection. The Clean Air Act's Risk Management Program (RMP) regulated chlorine use in excess of 2,500 pounds. On-site storage at Holyoke was 28,000 pounds.

There was no question that Holyoke Water Works had to prepare an RMP. For help, the facility turned to the same firm that engineered the treatment plant: Tighe & Bond.

The objective of the RMP was to protect the environment from an accidental release of hazardous materials. "Our job is to troubleshoot before trouble happens," Tighe & Bond Industrial Hygienist Mike Matilainen said.

An offsite consequence analysis determined the effect of a total release of the chlorine. Through computer modeling, Tighe & Bond illustrated this worst case scenario. The information is invaluable to local authorities because it identifies the affected area and where evacuation would be necessary in the event of a release. The firm also modeled alternative release scenarios that might be more likely to occur as a result of leaky valves or broken pipes.

Coordinating procedures with local emergency response teams made them aware of potential hazards and informed Holyoke Water Works management and personnel of the response and support they could expect in an emergency. Tighe & Bond scheduled and conducted meetings to share information with the public as well as the FBI. (The FBI was notified because of possible terrorist interest in hazardous materials.)

The RMP also required process hazard analysis and developing specific training for individual processes before allowing employees to work on them. Detailed instructions had to be written for routine operations as well as for emergency operations and maintenance.

Tighe & Bond handled it all, developing health and safety programs, writing procedures manuals and training employees. Extensive documentation was prepared in less than three months.

Download: Here

Sponsored Recommendations

Blower Package Integration

March 20, 2024
See how an integrated blower package can save you time, money, and energy, in a wastewater treatment system. With package integration, you have a completely integrated blower ...

Strut Comparison Chart

March 12, 2024
Conduit support systems are an integral part of construction infrastructure. Compare steel, aluminum and fiberglass strut support systems.

Energy Efficient System Design for WWTPs

Feb. 7, 2024
System splitting with adaptive control reduces electrical, maintenance, and initial investment costs.

Blower Isentropic Efficiency Explained

Feb. 7, 2024
Learn more about isentropic efficiency and specific performance as they relate to blowers.