Archive

March 2013
Using small increments of time to measure flow, liquid level and similar water and wastewater processing variables provides more accurate results and improves reliability over conventional mechanical methods. These include impellers, floats and other...
Corroded pipeline leads to an estimated 1.7 trillion gal of water leaks per year. WWD Assistant Editor Amy McIntosh spoke with Richard Grant, principal at Russell Corrosion Consultants, about the origin of corrosion and the importance of treatment. Amy...

POLL

Raleigh, N.C., has added a small increase to water bills as a permanent watershed protection fee. Do you agree with this idea?: